IT/03-0854, Annual Report for: T11

Covering the Period from October 1, 2002 to June 30, 2003

 

Title of INCITS Subgroup: Fibre Channel Interfaces

 

Links:

·                        Link to Website of T11 (includes all documents, minutes, and member information)

·                        See Informal Description of Work:

·                        See Executive Summary.

·                        Link to T11 area on the INCITS Projects Database

·                        See Significant Accomplishments.

·                        See Significant Challenges.

·                        See Expected Challenges.

·                        See Committee Activities.

·                        See previous year's meetings.

·                        See next year's planned meetings.

·                        See Liaison Activities.

·                        T11 Membership and Officers.

·                        See Future Trends and Related Technical Activities.

·                        See Other Administrative Information.

Informal Description of Work:

T11 is responsible for storage interconnect and networking families of standards, including Fibre Channel, Fibre Channel protocol mappings to higher level architectures, SBCON, HIPPI, and a number of related management and API standards.  T11 is co-TAG to ISO/IEC/JTC 1/SC 25/WG 4 along with INCITS TC T10.

Executive Summary:

2002-2003 has been a period of consolidation and new beginnings within the committee.  The lack of resources and mergers have forced some committee members to drop their participation, but the new activities of the committee, together with widening applicability of the TC's standards have encouraged other organizations to become members.

 

Core standards:

The core standards of Fibre Channel continue to be refined, clarifying implementation requirements and adding new capabilities.

 

Interoperability:

Interoperability continues to be a key requirement, and technical reports defining the requirements of interoperability (FC-MI-2 and FC-DA) are major standards development projects.  A study group has been established to assist the FCIA in a more complete review of the FCIA Fibre Channel compliance documents.

 

Physical layer:

The physical layer technologies continue to improve in performance and cost-effectiveness, making the FC-PI-2 and FC-PI-3 standards the focus of intense concentration by organizations bringing these new technologies to the industry.  The tools for qualifying and testing these technologies are provided in the FC-MJSQ and FCSM technical reports.

 

Remote access:

Fibre Channel is becoming important as a high-performance secure mechanism for remote access to storage.  As a result, the FC-BB-2 and FC-BB-3 standard developments are bringing the telecommunication organizations and Fibre Channel switch and gateway manufacturers together to further improve long distance connection technology.  Liaison has been established with ATIS T1X1.5 and with ITU-T to communicate about the application of the Generic Framing Protocol to Fibre Channel.  In addition, a study group has been established to support the IETF standardization of the transmission of IPv6 information over Fibre Channel.

 

Security:

The use of Fibre Channel links in more sensitive environments and outside secure computer rooms has increased the requirements for security.  The FC-SP standard is being developed to provide security protection for Fibre Channel environments.

 

Management and programming interfaces:

Fibre Channel environments are growing in sophistication and complexity.  To provide management and application support for such environments management and application programming interfaces, including FC-SWAPI, FC-HBA, FAIS, SM-AMD, and SM-MM are being developed.

 

As a result of these activities, the total program of work of T11 during the period of this annual report is as follows:

 

Family

Projects in Development

Projects in Approval

Published Standards

Total

FC

T11

 

1

 

1

FC Physical
T11.2

3

2

1

7

FC Logical
T11.3

5

5

5

15

Mgmt

T11.5

5

 

1

6

HIPPI

T11.1

 

1

 

1

TOTAL

 

14

9

7

30

 

T11 work continues to be recognized and supported by the industry. For this reason, 8 new standards have been brought into the committee during this period.  T11 had 57 member organizations in June of 2003, a decrease from 62 in October 2002. Part of this decrease reflects effects of the economy that have refocused some companies to other technologies and prevented others from attending the meetings as they would have liked. Another part of the decrease reflects the merging of member organizations. An additional 11 organizations participate in the T11 Task Groups.  The T11.5 Task Group is continuing to bring in new companies.

 

Five standards have been reaffirmed. The FC-SW standard was withdrawn because it has been replaced by FC-SW-2.

 

The following is the outline of the task groups under T11 and their project allocation:

T11: Technical Committee for Device Level Interfaces

The technical committee has taken on the responsibility for the HIPPI documents still in process, including HIPPI-6400-OPT. It has also taken the primary responsibility for those documents that cross several areas of expertise, allocating individual portions of the responsibility to the task group with the necessary expertise. 10GFC is in the final stages of approval.

TG T11.2: Physical Variants

The projects currently allocated to this task group include: FC-MJSQ, FC-PI-2, FC-PI-3, FCSM, and FCSM-2.

TG T11.3 Interconnect topologies and protocol mapping

The projects currently allocated to this task group include: FC-AE-2 (which is expected to be divided into multiple projects in August), FC-FS, FC-FS-2, FC-GS-4, FC-MI-2, FC-SW-3, FC-BB-2, FC-DA, FC-SP, and FC-SB-3.  In addition, there are three study groups, one studying Fibre Channel conformance documents, one studying FC-BB-3 extensions to FC-BB-2, and a third studying IPv6 over Fibre Channel.

TG T11.5 Storage Management Interfaces:

The projects currently allocated to this group include: FC-HBA, FC-SWAPI, SM-AMD, SM-MM, and FAIS.

 

Significant Accomplishments

The committee has forwarded 8 new project proposals during this period, four associated with management, two associated with the physical layer, one associated with interoperability, and the last a revision of the core FC-FS document.

The committee has completed 8 documents to the stage that allowed them to be forwarded to INCITS for public review and approval. This represents thousands of hours of work by volunteer officers, editors, and contributors.

Over 602 documents and presentations have been prepared supporting the technical and administrative activities of the committee.

 

Significant Challenges

The most significant challenge this year has been associated with the broadening applicability of Fibre Channel and storage networking technologies.  The INCITS TC T11 activities have created subsidiary activity in a number of new venues, creating heavier workloads and more extensive and demanding liaison activities.

 

The increased workload has created a requirement for more hours of meetings.  We have partially accommodated that requirement by rescheduling the meeting week, organizing more efficient meetings, and streamlining and focusing the plenary meetings.  However, the demands have also created more interim meetings and interim teleconferences.  This increased workload has also placed more strain on the resources of individual member organizations, sometimes requiring multiple members to attend parallel meetings.

 

The increased breadth of the activities has increased the liaison efforts as well. Liaison activities now extend to ATIS Working Group T1X1.5, ITU-T, the Homeland Security Standards Panel, the Fibre Channel Industry Association (SANmark, roadmap and speed forums), and the working groups of the IETF.  Fortunately, T11 has members in common with most of the organizations requiring liaison.

 

Expected Challenges

As stated in the last annual report, the economy continues to be a challenge.  We have had several of our key personnel unemployed for various periods during the last several months and several organizations have withdrawn membership because of resource constraints.  The effects of this remain unpredictable, but a high percentage of the people are finding new positions, many continuing their standards careers within the new organization. 

 

A second major challenge is the expansion of storage networking requirements into new technical areas.  One example is the FC-BB-3 standard that now requires liaison with ATIS T1X1.5 and ITU-T SG15 Q.11/15 concerning GFP transmission of Fibre Channel frames.  A second example is the IPv6 over Fibre Channel study group that now performs an advisory activity to the author of the IETF draft of the same subject.  A third example is Fibre Channel management, which requires T11 liaison with both the Storage Networking Industry Association (SNIA) and the IETF.  Such actions significantly expand both the influence and the responsibilities of TC T11.

 

A third major challenge is a large new set of technical capabilities that are now being brought into TC T11 for standardization.  These include among many others:

 

 

These create new workloads and demands on all members.

 

Committee Activities

Previous meetings for the reporting period

 

Oct. 7-11, 2002 New Orleans, LA (T11 #53, T11.2 #26, T11.3 #23, T11.5 #1) 

Dec. 9-13, 2002 Tucson, AZ  (T11 #54, T11.2 #27, T11.3 #24, T11.5 #2)

Feb. 3-7, 2003 Newport Beach, CA (T11 #55, T11.2 #28, T11.3 #25, T11.5 #3)

Apr. 7-11, 2003 Santa Fe, NM (T11 #56, T11.2 #29, T11.3 #36, T11.5#4)

June 2-6, 2003 Minneapolis, MN (T11 #57, T11.2 #30, T11.3 #37, T11.5 #5)

Next 12 months of meetings

Aug. 11-15, 2003        Cambridge, MA

Oct. 6-10, 2003           Oklahoma City, OK

Dec. 8-12, 2003          Paradise Is., BA Bahamas

Feb. 2-6, 2004             Dana Point, CA

Apr. 5-9, 2004             Monterey, CA

Jun 7-11, 2004             Chicago, IL

 

Full details of these meetings can be found by pressing the meetings link at www.t11.org. Currently the plenary meetings of the TC and TGs occur on Thursday of the meeting week.

 

Liaison Activities

TC T11 and its task groups maintain liaison with the following organizations. Most liaison representatives are member organizations with representatives in both INCITS TC T11 and the liaison organization.

 

INCITS:

Liaison is maintained with INCITS (INternational Committee for Information Technology Standards) to keep the committee informed of the actions of the INCITS organization and the progress of our projects within INCITS. See http://www.incits.org/ for further information.

 

TC T10:

Liaison is maintained with INCITS TC T10 (Technical Committee on SCSI Interfaces). The SCSI command set and protocols are carried across the majority of Fibre Channel connections. For more information about T10 see http://www.t10.org/.

 

IETF:

Liaison is maintained with two parts of IETF (Internet Engineering Task Force), the ips (TCP/IP for storage) working group and a more general liaison with the security and transport activities of IETF. The IETF ips working group has two projects key to TC T11. One of those projects, FCIP, is used in the FC-BB-2 standard. The second, iFCP, uses IP infrastructure to support Fibre Channel Fabric capabilities. The FC-SP project makes use of much of the work of the security working groups, particularly the ipsec working group. For more information about IETF's ips and security working groups, see http://www.ietf.org/.  More recently, we are seeing some interest in developing MIBs for Fibre Channel devices, which may also require liaison with IETF.  An Internet draft for IPv6 transmission over Fibre Channel has also been prepared, requiring liaison with the author and Internet area directors.

 

FCIA:

Liaison is maintained with the FCIA, the Fibre Channel Industry Association. The FCIA is a trade and technical organization that involves most of the manufacturers of products compliant with TC T11 standards. For T11, one of the most important activities is its Fibre Channel Technology Road Map. The road map provides up-to-date guidance about user requirements for the technologies being standardized by TC T11. Another key activity is the SANMark Qualified Program that provides tests and a qualification program examining Fibre Channel interoperability and compliance. For more information about FCIA, see http://www.fibrechannel.org/.

 

SNIA:

Liaison is maintained with SNIA, the Storage Networking Industry Association. SNIA is a trade and technical organization that addresses the use of Fibre Channel and other technologies for the creation of large storage area networks (SANs). SNIA's technical committees provide many inputs into the TC T11 activities, especially with respect to SAN management functions and the security of SANs. For more information about FCIA, see http://www.snia.org/.

 

SFF Committee:

Liaison is maintained with the SFF Committee, formerly named the "Small Form Factor" committee, but now known by its letters. The SFF is an industry organization that documents industry standards in areas typically avoided by accredited standards organizations. Such areas include optical transceiver modules used by Fibre Channel, mechanical standards for Fibre Channel and SCSI storage devices, and connectors for Fibre Channel. Formal liaison is maintained with three SFF Special Subject Working Groups (Transceivers, High Performance Electrical Interconnect, and High Speed Optical Interconnect).  For more information about SFF, see http://www.sffcommittee.org/ie/.

 

T1X1.5:

Liaison is maintained with T1X1.5, a working group of Technical Sub-Committee T1X1, a committee sponsored by the Alliance for Telecommunications Industry Solutions and accredited by the American National Standards Institute. T1X1.5, the Optical Hierarchical Interfaces Working Group, prepares technical reports related to telecommunications network technology pertaining to optical network hierarchical structures. One such activity involves the encapsulation of Fibre Channel communications across optical networks using GFP, the Generic Framing Protocol. For more information about T1X1.5, see www.t1.org/t1x1/_x15-rms.htm.

 

ITU-T SG-15 Question 11/15

Liaison is maintained with ITU-T SG-15 Q.11/15, a Study Group sub-group of the International Telecommunication Union, Telecommunication Standardization Section.  The group maintains liaison with TC T11 to verify that the Generic Framing Protocol properly supports Fibre Channel.  For more information about ITU-T SG-15, see http://www.itu.int/ITU-T/studygroups/com15/index.asp

 

XFP

Liaison is maintained with XFP, an industry consortium that develops serial optical transceiver modules at the 10 Gb/s Fibre Channel rate. XFP has defined a serial 10 Gb/s interface called XFI that is of interest as a possible target of T11.2 standardization. For more information about XFP, see http://www.xfpmsa.org/.

IEEE 802.3ae

Liaison is maintained with IEEE 802.3ae, the technical committee that develops 10 Gigabit Ethernet standards. The 1 lane and 4 lane physical layers and the optical signal encoding used in the 10 GFC standard are derived from the IEEE 802.3ae standard. For more information about IEEE 802.3ae, see grouper.ieee.org/groups/802/3/ae.

DMTF

Liaison is maintained with the DMTF (Distributed Management Task Force), an organization that develops management standards for computer systems and networks based on CIM (Common Information Model). TC T11 is involved with providing the necessary input to DMTF to properly represent and manage storage area networks. For more information about DMTF, see http://www.dmtf.org/.

Membership and Officers

The membership lists for TC T11 are available on the T11 website under the members button. The officers of TC T11 and its TGs are shown below.

 

Officers

 

The officers of TC T11 and its TGs are shown below.

 

TC T11 Chair: (appointed 02/1/02)

Robert Snively

Brocade Communications Systems, Inc.

1745 Technology drive

San Jose, CA 95110

Phone: (408) 333-8135

E-mail: rsnively@brocade.com

 

TC T11 Vice-Chair: (appointed 1/1/97)

Mr. Edward L. Grivna

CYPRESS SEMICONDUCTOR

2401 E. 86th Street

Bloomington, MN 55425

USA

Phone: 952-851-5046

Fax: 952-851-5087

E-mail: elg@cypress.com

 

TC T11 International Representative: (appointed 6/1/2001)

Gary Robinson

EMC CORPORATION

ADD ADDRESS

USA

Phone: 508-435-1000

Fax: 405-324-3794

E-mail: robinson_gary@emc.com

 

TC T11 Secretary (appointed 2/1/94)

Neil Wanamaker

10624 Icarus Ct.

Austin, TX 78726

USA

Phone: 512-257-7633

Fax: 512-257-7877

E-mail: ntw@earthlink.net

 

TG T11.2 Chair (appointed)

Schelto Van Doorn

INTEL CORPORATION

PCI-104-E2

44235 Nobel Drive

Fremont, CA 94538

USA

Phone: 408-398-2441

E-mail: schelto.vandoorn@intel.com

 

TG T11.2 Vice-Chair (appointed)

Mr. Edward L. Grivna

CYPRESS SEMICONDUCTOR

2401 E. 86th Street

Bloomington, MN 55425

USA

Phone: 952-851-5046

Fax: 952-851-5087

E-mail: elg@cypress.com

 

TG T11.2 Secretary (appointed 8/6/97)

Bill Ham

Hewlett Packard

MS: SHR3-2/W8

Shrewsbury, MA 01545

USA

Phone: 907-828-9102

Fax: 978-470-0321

E-mail: bill_ham@ix.netcom.com

 

TG T11.3 Chair (appointed 02/2001)

Craig Carlson

QLogic

6321 Bury Drive

Eden Prairie, MN 55346

USA

Phone: 952-932-4064

E-mail: craig.carlson@qlogic.com

 

TG T11.3 Vice-Chair (appointed 4/23/99)

George Penokie

IBM Tivoli Systems

3605 Highway 52 N

MS: 2C6

Rochester, MN 55901

USA

Phone: 507-253-5208

Fax: 507-253-2880

E-mail: gop@us.ibm.com

 

TG T11.3 Secretary (appointed 2/09/2001)

Bill Martin

BROCADE COMMUNICATIONS

7213 Marblethorpe

Roseville, CA 95747

USA

Phone: 916-772-3658

Fax: 916-771-5416

E-mail: bmartin@gadzoox.com

 

TG T11.5 Chair (appointed 8/5/2002)

Roger Cummings

Veritas Software

HRO3/3007

400 International Parkway Address

Heathrow, FL 32746

Phone: 407-357-7257

FAX: 407-357-7590

E-mail: roger.cummings@veritas.com

 

TG T11.5 Vice-Chair (appointed 10/8/2002)

Robert Pulley

McData

2030 Fortune Dr. #200

San Jose, Ca. 95131

Phone: 408 325 5968

FAX: 408 232 9869

E-mail: robert.pulley@mcdata.com

 

TG T11.5 Secretary (appointed 10/8/2002)

Nabin Acharya

Intersan

100 Enterprise Way, Suite C3

Scotts Valley, CA 95066

Phone: 831 431 1385

FAX: 831 430 0691

E-mail: nabin@intersan.net

 

Future Trends and Related Technical Activities

 

The work of T11 has become significantly more important because of the economy and the threats to corporate organizations and data. The implementation of Fibre Channel based systems for Storage Area Networks (SANs) has demonstrated that more efficient use can be made of computer and storage resources in many environments. At the same time, the long-distance capabilities provided by Fibre Channel allow high performance mirroring and backup to assure the continuation of normal business in the event of natural or man-made damage to a part of the system. It is likely that both these requirements will continue to build the marketplace for T11 technology over the next several years.

 

Other technologies, including TCP/IP and SONET connections, will be used to extend SANs even beyond the 80 km T11-based physical layers will presently support. The development of these technologies will be within IETF and T1X1, although Fibre Channel specific portions of the work will be done within T11.3 or by liaison with T11.

 

The work of T11 has also become important because of its contributions to other technologies. It is the basis of 1 Gb/s Ethernet, SATA, SAS, and other technologies. TC T11's physical layers and signal integrity measurement techniques have been used by a number of technologies in the range of 1 to 4 Gb/s and also at 10 Gb/s.

The management of SANs will continue to become an increasingly important activity. While it is likely that significant parts of the work will be carried forward within T11, other parts of the work may be carried forward in other standards organizations or industry consortia, including IETF, T10, SNIA, and DMTF. Much of the work specific to Fibre Channel for these broader organizations will be carried on within T11.5 or by liaison with T11.

 

Bandwidth increases beyond 10 Gb/s have been discussed within T11.2 and are likely to be part of formal proposals over the next 2-3 years. Proposals for 40 Gb/s and 100 Gb/s have been mentioned.

 

Industry consortia remain an important source of new standards activities.  There is a strong desire by many organizations to create more formal standards based on those standards activities.  We have seen at least one case recently that elected to use INCITS fast-track standardization as the primary mechanism for carrying the documents forward into the standards world.  We have seen a second case that elected to use T11 instead of a consortium because T11 has gained a reputation for fairness and reasonably fast action.

 

The heavy workloads and highly technical environments associated with our activities seem tailor made for interim electronic meetings. However, we have not yet been able to fully exploit this capability, principally because of restrictions implemented by corporate firewalls. We would welcome helpful solutions to this challenge from INCITS or other organizations.

 

Other Administrative Information

Financial Statement:

T11 meeting activities are financed and hosted by volunteer organizations. The individual participants and their member organizations finance all travel, room, and related business expenses. T11 has no direct financial activities.

 

Web-based procedures:

T11 has made a major transition in early 1998 from paper-based operating procedure to a completely web-based, interactive procedure. An online document register allows documents to be numbered automatically, submitted via ftp, and linked into the register for click-able access. The full details (company, address, phone, e-mail etc.) of attendees at all T11 plenary meetings, and of Principal and Alternate Representatives of all T11 member companies, are available online, and people may update their own details under password control. A web-based Letter Ballot scheme is in place that allows the submittal of comments by completing a form OR attaching a file to the vote. Completing a web-based form also generates future meeting notices. Both the document and "people" databases are searchable.

These web-based procedures have created the requirement for all documents to be presented electronically in accordance with guidelines established by the TC and published as T11/98-050v2 . Additional procedures have been established for T11.3 to fully exploit the capabilities of electronic distribution. These procedures, documented in T11/02-223v0 are being considered as procedures for T11 and its other task groups as well. The website is presently financed by corporate donations.  Our Internet Service Provider is currently installing a dedicated system for the use of our organization.  The administrator is providing tutorials to train more members in the proper management of the website.

Recommendations:

Some clarifications have been requested on the intellectual property policies of INCITS.